Micrometers, bore gauges & limit gauges
Shaft diameters, bearing bores, widths and mating sizes; select range and resolution for the tolerance
04 / INTERNAL QUALITY SYSTEM
BRF applies internal controls around each customer requirement — from drawing review and material selection to process checkpoints, inspection evidence and accountable release

QUALITY / INSPECTION PLANNING
Match the measurement method to the critical dimension, form, surface and function, from first article through in-process checks and final release

Shaft diameters, bearing bores, widths and mating sizes; select range and resolution for the tolerance
Small profiles, hole spacing, slots and stamped outlines; optical access and edge definition must suit the feature
Datum-based position, flatness and perpendicularity of housings and complex parts, with a defined fixture and measurement strategy
Form of shafts, sleeves and bearing rings; use a dedicated form measurement method where the drawing requires it
Radial and face runout relative to a defined datum; a runout reading alone does not establish roundness or straightness
Ra / Rz of bearing seats, journals and roller surfaces, using the drawing-defined filtering and evaluation settings
Rockwell or Vickers testing where appropriate; verify material certificates and specify composition or coating tests when required
For assembled rolling bearings where specified: radial/axial clearance, starting or running torque, and noise/vibration under defined test conditions

Define critical features → select instruments and fixtures → verify first article → inspect during production → record release evidence; use suitable calibrated equipment and agree sampling and acceptance limits for the programme
OUR PERFORMANCE
Measured. Verified. Continuously Improved.
THE OPERATING PRINCIPLE
A controlled outcome begins with a controlled conversation. Our internal system turns the customer brief into a practical sequence of responsibilities, checks and records
Drawing revision, material, finish, tolerance and critical features are clarified before the route is agreed
Key operations, first-piece checks and inspection points are defined around the part and its production route
Relevant inspection evidence, open points and release decisions are kept visible to the responsible people
BRF / QUALITY ROUTE
QUALITY ASSURANCE CONTROLS
BRF applies internal quality practices through documented working methods, responsibility, review points and records. The controls used for each programme are confirmed around the customer requirement and manufacturing route
Key operations and inspection points are identified around the agreed part and production route
Relevant QC tools and calibration checks are organised to support reliable measurement activity
Supplier material and process inputs can be reviewed against the needs of the customer programme
Sampling and verification methods are selected where they suit the part, risk and agreed requirement
Questions, complaints and changes are routed into a visible review and corrective-action loop
Early output can be reviewed before the route moves into repeat or higher-volume production
RESPONSIBLE BUSINESS / 2026
BRF has joined the SME Climate Hub commitment community. This commitment reflects our intention to build practical climate awareness into the way the company grows, operates and works with its partners
QUALITY STARTS WITH CLARITY
Send a drawing, revision, material, tolerance, finish and target volume. BRF will define the review path and controls that can be applied before a formal quotation or production commitment